Tuesday, June 2, 2015

It's Now June

Have the exterior of the house painted + frame windows + add trim along bottom of house, around garage doors, porch + break up two concrete slabs
Remove Debris Pile
Replace Powder Room Lights
Finish Baseboards Downstairs - install, spackle, caulk, paint, add plinth blocks
Paint 2 downstairs doors? (probably won't happen)
Build in Living Room Bookcases (leave painting of interior until later date)
Install Flooring Transition Pieces (in progress)
Fix Kitchen Tile
Seal Kitchen Countertops
Move Crib & Room Arrangement
Caulk Master Bathroom Shower
Replace Master Bathroom Toilet
Planting - strawberries, tomatoes, herbs
LOTS of Weedeating (in progress - although there will be several rounds)
Turn over Compost (in progress) & Spread Mulch
Install Playground - grind down tree stumps, taller garden wall, level ground, wood chips, put together swing set

Replace light bulbs all over the house; we have about 10 that are burnt out
Send off updated pictures to family member
Deal with life insurance stuff (in progress)
Spring clean
Set up watering system
Fertilize the trees
Get quotes for new roof
Find changing table (make due with table)
Wash baby gear
Update family notebook - bills, restaurants, basic info, etc (in progress)
Try out new babysitter (probably won't happen)
Arrangements for Addie's care when in labor (in progress)
Find a church (probably won't happen)
Organize Office
Move some furniture around
Get vehicles smog tested
Spray for bugs
Touch up wall paint
Blinds/Curtains for Sliding Doors & Random windows upstairs
Fix Sliding Doors' Bolts